Metal Doorsets

Metal Doorsets are available in different configurations to satisfy the client’s requirements and its applications in various fields like cleanrooms, fire-rated doors, industrial doors etc. In addition to the single leaf and double leaf doors with removable door over panels;  borrowed light and glazing can be introduced wherever required.

Doorsets are specifically tailored to the requirements of the client with special attention being paid to the use of galvanised steel / SS304 throughout the door.

The doorsets are capable of accepting glazing in many configurations with air vents, louvers and a wide range of hardware.

For the cleanroom applications of doors all the accessories used in the cleanroom doors are suitable for cleanroom applications.

Fire Rated Doors

  • Fire Rated Doors Available in fire resistant levels up-to 2 hours all tested to BS 476 Part 20 & 22, IS3614 (Part 2)
  • Our fire doors are tested and certified by CBRI (Roorkee), Warringtonfire (UK) and UL (USA) and CE.

Ironmongery

  • The Complete fire rated Ironmongery is used in our fire rated doors which is sourced from renowned manufacturers.

Product

Modular Clean Room Panel ↗

A complete range of partition walls and ceiling systems are available to meet the technical specifications of controlled environment rooms

Metal Doorsets ↗

Metal Doorsets are specifically tailored to the requirements of the client with special attention being paid to the use of galvanised steel / SS304 throughout the door.

Office Partitions ↗

MNS-Instruments also specializes in the supply and installation of office partitions. MNS-Instruments office partitions are fully re-locatable and demountable mono-black systems.

Lab Furniture ↗

We at MNS-Instruments offers Customer Single window Solutions for all their facility needs. An important component in setting up a Laboratory in Clean room industry is Modular Laboratory Furniture and Equipment’s.

Services

HVAC Systems ↗

The core component of any such facility is HVAC System which has to be designed and delivered considering various international standard.

Electrical System ↗

The Electrical system is one of the key services in the facility which requires optimum distribution of power and illumination. It also covers the backup power distribution, to ensure seamless power supply and ensuring no break in any key process during the manufacturing. 

Utilities & Piping ↗

We undertake Utilities work from concept to commissioning which includes URS, System Design, Procurement of Equipment, installation, testing and commissioning and Validations.

Flooring ↗

Epoxy flooring is a very critical application in any Pharmaceutical industry. Classification of the Cleanrooms and cleanliness is also based on flooring and cleanliness.